Quote:
Originally Posted by plthijinx
ok. i got this. wait a minute. ok. been drinkin' since off work. err well got home but the system works well. what problem are you having? me be cornfused.
|
The old waste pipe ended at the plywood subfloor. I had to build up the tile so it would be at the same level as hardwood floors that we were getting put in in the hallway. This meant that the toilet, sitting on the tile, wouldn't quite reach a single wax ring, so I had to stack a second one on top, kind of like a double cheeseburger.