View Single Post
Old 02-06-2019, 10:49 AM   #124
Clodfobble
UNDER CONDITIONAL MITIGATION
 
Join Date: Mar 2004
Location: Austin, TX
Posts: 20,012
There's a major thoroughfare RR crossing a few miles from our house that's right in the path to the kids' school... And more importantly, immediately parallel to the highway. When a train comes through, it backs up traffic a few miles down the road toward our house in one direction, and on the other side it stops all traffic on both the access road and the highway for up to 3 exits back. And the trains routinely come to a dead stop just like that rural one above.

Anyway, they have a major construction plan to fix it that will elevate either the train or the traffic (couldn't tell from the blurry specs in the local paper) to keep them flowing independently, and also somehow involve a roundabout. Plans call for something like 2.5 years of construction, but they assure us they will keep the minimum 2-lanes-in-each-direction open during that time. I'm just going to keep taking the back way home, myself.
Clodfobble is offline   Reply With Quote