Quote:
Originally Posted by Kingswood
How thick is the concrete? How long will it take all that concrete to set?
|
As thick as they pour it (which means I don't know) and 31 days to max strength. Being a waterfront, quake prone, location, they probably were pouring the slab and the columns down to bed rock, all in one piece (monolith) for strength.
edit
Looking at the closed streets, empty parking lots and support trucks. I'd guess it was a very expensive Sunday operation. Overtime for everyone, even the cops blocking traffic.