The Cellar  

Go Back   The Cellar > Images > Quality Images and Videos
FAQ Community Calendar Today's Posts Search

Quality Images and Videos Post your own images and videos of your own days

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 02-17-2011, 10:03 PM   #11
plthijinx
Master Dwellar
 
Join Date: Aug 2003
Posts: 4,197
alright. we went into overtime tonight. after supper we started pouring concrete. i had wanted to get a pic of the shower drain flange and the amount of distance from the floor to the bottom of the flange but paul started mixing concrete and i had to haul butt to help so i didn;t have my camera on me. anyway, there was about a 3 inch gap or more between the existing concrete and the bottom of the flange. i cut off one inch earlier today and recommended more but paul didn;t want to do that. well i finally convinced him. reasoning being we would loose depth of the finished floor if we left it the way it was. so i took off one more inch from the drain pipe then set the flange. we mixed 1 and 1/3 bag of quickcrete and floated in a floor. when doing this sort of thing you want the cement dry. add only enough water to make it moist then use a trowel and level it as best you can using a level. doesn;t have to be perfect. the installation kit we are using makes the slope fool proof.
Attached Images
    
__________________
For your dreams to come true, you must first have a dream.
plthijinx is offline   Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT -5. The time now is 07:37 PM.


Powered by: vBulletin Version 3.8.1
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.