The Cellar  

Go Back   The Cellar > Main > Technology
FAQ Community Calendar Today's Posts Search

Technology Computing, programming, science, electronics, telecommunications, etc.

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 11-06-2001, 09:00 AM   #2
russotto
Professor
 
Join Date: Jan 2001
Posts: 1,788
Heck, programmers have known this for a long time. We just pull a number out of the air and double it. Our manager then doubles that, his manager cuts it by 10%, the manager above him sets a deadline date completely unrelated to the estimate, and all the paperwork is fulfilled.

I've always thought the impossibility of an estimate was related to a theorem besides Goedels, though -- basically, I think the difficulty of doing an estimate is no less than the difficulty of doing the job in the first place.

added later

I just checked out the link. Turns out he does address my objection, and agrees with it, with respect to "program correctness".

Quote:
Since the specification fully specifies the behavior of the program, the complexity
(C) of the specification must be at least approximately as large as the complexity of a minimal program for the task at hand.
This is something I've been saying since I learned of (and started doing) proofs of correctness as a freshman in college. Ahh, 'tis good to be vindicated. I don't suppose the Software Engineering Institute is likely to say "sorry we wasted your time" and close up shop because of this paper, though....

Last edited by russotto; 11-06-2001 at 09:09 AM.
russotto is offline   Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT -5. The time now is 02:16 PM.


Powered by: vBulletin Version 3.8.1
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.