The Cellar  

Go Back   The Cellar > Main > Current Events
FAQ Community Calendar Today's Posts Search

Current Events Help understand the world by talking about things happening in it

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-08-2010, 11:43 PM   #11
tw
Read? I only know how to write.
 
Join Date: Jan 2001
Posts: 11,933
Quote:
Originally Posted by Flickster View Post
Latest report I'm seeing from the AP, the blame is being placed on a bubble of methane, which could also point to some issues with the cementing process.
This problem occurred (apparently) due to heating of that cement - the curing process.

Ironically, nine BP executives were on the rig when the explosion ripped into the party room. They were celebrating the rig's extraordinary safety record.

Too many things failed simultaneously. The process should have been monitored by those doing the cementing. Alarms should have gone off. They didn't. Chains of safety systems - altogether called a blow out preventer - did not work. Robots could not turn off valves manually. And BP quietly admitted that the leak may be 10 times larger than 5000 barrels per day. That means nothing even partially cut off the flow.

Well, the dome has failed. Hydrates are freezing - clogging the pipe. At that depth, even methane is at near freezing points. A complicated thermodynamic problem.
tw is offline   Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT -5. The time now is 04:13 AM.


Powered by: vBulletin Version 3.8.1
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.