The Cellar  

Go Back   The Cellar > Main > Technology
FAQ Community Calendar Today's Posts Search

Technology Computing, programming, science, electronics, telecommunications, etc.

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-05-2015, 06:20 PM   #6
xoxoxoBruce
The future is unwritten
 
Join Date: Oct 2002
Posts: 71,105
The wiki article on building the WW II Liberty ships describes how the US redesigned the UK model, changing construction from riveted to welded plates and a different propulsion system eliminating the need for difficult to build reduction gears.
The welded plates became problematic, but was ironed out in later construction techniques post Liberty program.
Quote:
The first ships required about 230 days to build (Patrick Henry took 244 days), but the average eventually dropped to 42 days. The record was set by SS Robert E. Peary, which was launched 4 days and 15½ hours after the keel was laid, although this publicity stunt was not repeated: in fact much fitting-out and other work remained to be done after the Peary was launched. The ships were made assembly-line style, from prefabricated sections. In 1943, three Liberty ships were completed daily.
__________________
The descent of man ~ Nixon, Friedman, Reagan, Trump.
xoxoxoBruce is offline   Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT -5. The time now is 01:50 PM.


Powered by: vBulletin Version 3.8.1
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.